RES-04

Data resilience and continuity

Failover test and recovery exercise

Duration
8 to 12 days
Main deliverable
exercise report with measured RTO/RPO against targets

Who it's for: an organisation with a documented recovery plan that has never been exercised, or whose last exercise is more than a year old.

The problem: the first real test invariably reveals undocumented dependencies — a secondary service, a name resolution, a service account, a start-up order. Better to discover them on a day you choose than on a day imposed on you.

What I do

  • preparation of the scenario, the scope and the success criteria, validated before the exercise
  • verification of technical prerequisites and an agreed stop point should the exercise drift
  • execution of the failover under real conditions across the defined scope
  • timing of the RTOs actually achieved and verification of the RPO observed
  • application-level validation of the recovery with the business contacts, beyond simply starting up
  • identification of missing dependencies and of blocking points
  • controlled failback and integrity check afterwards

Deliverables

  • exercise report with measured RTO/RPO against targets
  • log of gaps and undocumented dependencies
  • prioritised correction plan
  • corrected failover procedure, repeatable by your own teams

What changes

your recovery plan moves from being a document to being a demonstrated capability, with an exercise record that stands up in an audit.

Prerequisites: a recovery environment available, a validated exercise window, infrastructure and business teams available for the duration of the exercise.

Quoted on request — reply within 48h

← Back to the service packages